Bentley Motors
2.7 MWp · 1,378 spaces
Energy Hubs
As featured on
3ti has installed 17.6 MWp of solar PV across the UK — including the two largest solar car parks at Bentley Motors and JP Morgan. Cut energy costs by up to 40% and generate rental income from day one.
Trusted by leading UK organisations
Most business car parks sit empty between peak hours, exposed to the elements, drawing maintenance costs and generating nothing. Meanwhile, UK organisations face rising energy costs, incoming fleet electrification mandates, and pressure to demonstrate credible net-zero progress. The government requires the UK to grow from 76,000 publicly available EV charging devices today to 300,000 by 2030. Grid connection bottlenecks are delaying deployment everywhere. And energy prices show no sign of easing.
A solar canopy transforms idle tarmac into a productive infrastructure asset: generating clean electricity, sheltering vehicles, and powering EV chargers from the same footprint you already own. The question is not whether solar car parks make sense, but how quickly your organisation can move.
3ti designs, builds, and operates solar car parks and EV charging hubs for organisations across the UK. Our end-to-end approach means one partner handles everything: from initial site survey through planning, installation, grid connection, and ongoing asset management. Many clients proceed on a fully funded basis, with 3ti investing the capital, and the site owner receiving rental income and access to discounted renewable electricity from day one.
Purpose-built steel canopies mount high-efficiency solar panels overhead, sheltering vehicles while generating clean power from previously unused airspace above your car park. Solar generation feeds directly into EV chargers, reducing grid demand and operational charging costs for your fleet or visitors. Optional battery systems store surplus generation, allowing you to shift energy use and reduce peak demand charges.
Whether you prefer to own the asset outright or prefer a funded model where 3ti retains ownership, we structure the arrangement to suit your organisation. Site operators get full visibility and control over energy flows, charging schedules, and system performance through integrated energy management software.
The process has been designed to minimise disruption and maximise clarity at every stage.
Our team reviews your site, parking layout, grid connection, and energy profile, then provides an indicative design and business case at no cost. Takes less than 2 minutes to request — no technical knowledge needed.
We produce a detailed proposal covering canopy design, solar capacity, EV charging specification, planning considerations, and indicative programme.
3ti manages the full installation: structural engineering, solar PV, EV chargers, grid connection, and commissioning, with minimal disruption to your operations.
Post-installation, we provide performance monitoring and maintenance support so your asset continues to generate value year after year.
No cost, no obligation · Takes less than 2 minutes
2.7 MWp · 1,378 spaces
2.4 MWp · 880 spaces
The UK's second-largest solar car park, delivering approximately 2,100 MWh of on-site renewable generation annually for a major financial services campus — reducing grid dependence and energy costs significantly.
1.1 MWp · 456 spaces
The UK's first NHS solar car park, completed in 2023, proving the model works for public sector estates with complex procurement and planning requirements.
19.32 kWp · First police force globally
Merseyside Police became the first police force globally to install a Papilio3 solar EV charging unit, generating approximately 18 MWh in year one, equivalent to over 64,000 solar EV miles.
See what your site could generate · No cost, no obligation
"The force's target is to be Net Zero for all scope 1 and 2 emissions by 2040, and it is hoped exploring the use of technology such as this – which uses solar panels on its roof – will help us achieve that."
Track Record at Scale. 3ti has installed 17.6 MWp of solar PV capacity across the UK, including the two largest solar car parks in the country at Bentley Motors (2.7 MWp, 1,378 spaces) and JP Morgan Bournemouth (2.4 MWp, 880 spaces). We have solved the engineering, planning, and grid challenges that others are still learning about.
End-to-End Accountability. One team, one contract, one point of contact: from feasibility through decades of ongoing asset performance. No handoffs between disconnected sub-contractors.
Purpose-Driven Business. 3ti Energy Hubs earned a B Impact Assessment score of 98.4 against a median of 50.9 for ordinary businesses. Our commercial success and our environmental mission are the same thing.
Flexible Funding Structures. We work with organisations of all sizes to find a commercial model that works, whether capital purchase, lease, or a power purchase arrangement.
Deep Public Sector Experience. From NHS trusts to police forces to local authorities, we understand the procurement, planning, and stakeholder requirements of public sector clients.
UK solar is growing fast. The market is forecast to grow from 20.85 GW in 2026 to 32.5 GW by 2031 at a CAGR of 9.28%. In 2025, 269,000 solar installations were completed across the UK, the highest annual total ever recorded, 37% larger than the previous year. The government's AR7a CfD auction in 2026 secured 4.9 GW of solar capacity across 157 new projects, the largest single solar CfD award in UK history.
Every month you wait costs money. At the same time, the requirement to reach 300,000 publicly available EV charging devices by 2030, up from 76,000 today, means organisations that install infrastructure now will be positioned ahead of both supply constraints and regulatory pressure. The solar and EV charging markets are converging, and early movers gain the most.
Join leading UK organisations already generating clean energy from their car parks
Assessment slots for 2026 installations are limited — feasibility reviews typically take 2–3 weeks
3ti works with sites ranging from compact single-bay installations to multi-megawatt solar car parks of 1,000 or more spaces. Whether you have a small fleet depot or a large campus, our team will assess what is practical and cost-effective for your specific site.
Not necessarily. 3ti has experience working with leased sites and complex land arrangements. We will discuss ownership and tenure early in the feasibility stage to identify the right commercial structure.
Many clients proceed on a fully funded model where 3ti invests the capital. The site owner benefits from rental income and access to discounted renewable electricity without using their own budget. Outright purchase and hybrid arrangements are also available.
Timescales vary with site complexity, planning requirements and grid connection. 3ti manages the entire process: feasibility, design, planning, build and commissioning, and will give you a project-specific programme at the assessment stage.
Generated electricity can be used on site to reduce your energy bills, directed to EV chargers for fleet or staff use, exported to the grid, or a combination of all three. 3ti's design team optimises the solution around your consumption profile.
Yes. Solar canopy car parks are ideally suited to integrated EV charging. The canopy structure carries cabling naturally and the solar generation offsets the cost of charging, making the combination highly cost-effective.
We offer outright purchase, lease, and power purchase arrangements depending on your organisation's preferences and treasury requirements. Our team will walk you through the options and their respective benefits at the feasibility stage.
Solar car park canopies benefit from permitted development rights in many cases, though this depends on your site's location and planning constraints. 3ti handles the full planning process and will advise you on likelihood of approval before you commit. If planning consent is not granted, you are under no obligation to proceed and will not have incurred any cost.
Our team will review your site details and come back to you with a clear picture of what is feasible: indicative capacity, energy output, and commercial structure options. No cost, no obligation.
Find out how many kWp your site can support and what rental income to expect
🔒 256-bit SSL encrypted · UK GDPR compliant · No spam